Discovering major construction defects can put a condominium association under financial, operational, and legal pressure. Water intrusion, failing balconies, cracked concrete, roof leaks, and building-envelope problems can threaten property values, damage individual units, and lead to significant repair costs. For condo boards in Georgia, determining what went wrong is only part of the challenge. The association must also understand its maintenance responsibilities, preserve evidence, evaluate potential claims, and act within applicable legal deadlines.
A coordinated response can help protect residents, limit further damage, and preserve the association’s options for recovering repair costs. Here are the key steps a Georgia condominium association should consider when it discovers a potential construction defect.
What Is a Construction Defect?
A construction defect is a deficiency in the design, materials, workmanship, or construction of a building or component that causes damage, fails to meet applicable requirements, or prevents the property from performing as intended. Some defects become apparent shortly after construction. Others remain hidden for years before causing visible damage.
Condominium construction defects can affect common elements, limited common elements, or individual units. Because these areas may involve different maintenance obligations and ownership interests, identifying the source of a problem is essential.
Common examples include:
- Water intrusion and building-envelope failures: Improperly installed windows, inadequate waterproofing, or poorly sealed exterior walls can allow moisture to enter a building, potentially causing mold, deterioration, and interior damage.
- Roofs and roof penetrations: Roof leaks often begin at the points where something passes through or meets the roof. These include plumbing vents, HVAC curbs and refrigerant lines, exhaust fans, skylights, drains, scuppers, and rooftop equipment supports, along with transitions at parapets, walls, and curbs. Leaks can also develop as a result of inadequate slope that allows water to pond on low-slope membrane roofs.
- Structural and concrete deficiencies: Cracking, spalling concrete, deteriorating balconies, or improperly installed structural components may raise concerns about safety, durability, and costly repairs.
- Plumbing, drainage, and mechanical problems: Defective plumbing installations, inadequate drainage, and improperly designed or installed building systems can lead to recurring leaks, water damage, and disruptions for residents.
Not every maintenance issue constitutes a construction defect, and a visible symptom does not necessarily reveal its underlying cause. An independent technical evaluation can help determine whether the problem stems from original construction, design, materials, maintenance, later alterations, or a combination of factors.
What Should a Condo Board Do When It Discovers Construction Defects?
When a condominium association discovers a potential construction defect, the board should prioritize safety, document the condition, obtain an independent assessment, review the association’s responsibilities, and evaluate its legal options. Taking these steps early can help the association make informed repair decisions while preserving evidence that may be important to a future claim.
1. Address Immediate Safety Concerns
The board’s first priority is protecting residents and preventing further property damage. If a suspected construction defect creates a safety risk, take appropriate action immediately.
Safety tips for condo boards:
- Restrict access to potentially unsafe balconies, walkways, or structural areas.
- Contact qualified professionals for urgent structural inspections or other safety assessments.
- Address active leaks and take reasonable steps to prevent further water damage.
- Document conditions with photos and videos before repairs, when practical.
Do not delay emergency repairs to preserve evidence. When circumstances allow, document the defect before damaged materials are removed or replaced.
2. Document the Defects and Related Damage
Thorough documentation helps establish when a problem was identified, how it progressed, what damage occurred, and what steps the association took in response. It can also help technical professionals and legal counsel assess potential causes and responsibility.
The association should preserve relevant records, including:
- Dated photographs and videos of visible defects and affected areas.
- Engineering reports, inspection findings, and contractor assessments.
- Maintenance records, prior repair invoices, and resident complaints.
- Original construction plans, specifications, permits, and available inspection records.
- Developer, builder, and contractor correspondence, along with warranties and construction contracts.
- Insurance policies, claim correspondence, and records of emergency repairs or other related expenses.
The board should also maintain a timeline of when defects were first reported, when inspections occurred, and when repairs were performed. Records should be organized and retained in a way that allows the association and its advisers to reconstruct the sequence of events.
3. Obtain an Independent Professional Evaluation
An independent engineer or qualified building consultant can identify the likely cause and extent of a construction defect, recommend corrective repairs, and estimate costs. A repair that addresses visible damage may not resolve the underlying problem, such as a building-envelope failure causing recurring water intrusion. Leaks in particular can travel well away from their source, so water testing or electronic leak detection may be needed to locate the actual entry point before repairs begin. Before major repairs or destructive testing, consult legal counsel about preserving evidence when practical.
4. Review the Association’s Responsibilities
Review the condominium declaration, bylaws, maintenance provisions, construction contracts, and warranties to determine responsibility for common elements, limited common elements, and individual units. Under O.C.G.A. § 44-3-105, maintenance and repair responsibilities generally fall to the association for common elements other than limited common elements, and to unit owners for their units and associated limited common elements, subject to the condominium instruments. But these default responsibilities can be and often are modified by the condominium’s governing documents.
Damage inside a unit may originate from a defective roof or exterior wall, so the location of the damage does not necessarily determine who is responsible for repairs or costs. Reviewing the governing documents, technical findings, and applicable Georgia law can help clarify the association’s obligations and potential claims.
Many Georgia declarations, especially developer-drafted ones, require a membership vote or impose other preconditions before the association can sue the declarant or contractors, so consulting legal counsel early is important to ensure that these processes are complied with early.
5. Consult a Georgia Construction Law Attorney
A Georgia construction law attorney can help the association evaluate potential construction defect claims, review contracts and warranties, identify legal deadlines and notice requirements, and preserve evidence. Counsel can also advise on recovery options, including negotiation, mediation, arbitration, or litigation. Early legal guidance helps the board assess its options before evidence is lost or a filing deadline expires.
What If Construction Defects Are Discovered Before or After Developer Turnover?
Construction defects can be discovered while a condominium is still under development, after construction is complete but before the developer transfers control of the association, or years after turnover. The timing can affect who controls the association’s decisions, what records are available, and how the board approaches potential claims. However, an association should not assume it must wait for turnover to document defects or seek legal guidance.
Before Developer Turnover
Before turnover, the developer typically controls the association’s board, even if units have been sold and residents have moved in. If defects emerge during this period, the association should document the issues, request appropriate inspections, and preserve available construction records. Because the developer may also be involved in the construction or sale of the property, the association should consider independent professional and legal guidance when evaluating the defects and potential remedies.
After Developer Turnover
After control transfers to the unit owners, the owner-controlled board can assess the property’s condition, review the records and warranties provided during turnover, and determine how to address suspected defects. An independent inspection may help identify problems that were not apparent during the transition. The board should also review governing documents, construction contracts, warranties, and applicable legal deadlines with counsel.
Notice Requirements Before Filing Suit
Before filing suit, a Georgia condominium association must generally comply with the Right to Repair Act, O.C.G.A. § 8-2-35 et seq., which requires written notice of the claim to the contractor at least 90 days before filing and gives the contractor an opportunity to inspect, offer repairs, or offer a settlement. Associations face additional requirements under O.C.G.A. § 8-2-42 before suing over common-area defects. These include approval by a two-thirds membership vote, an in-person meeting between the board and the contractor, and advance distribution of the notice of claim to owners. Because these steps take time, associations should begin the process well before any deadline approaches.
How Long Does a Georgia Condo Association Have to File a Construction Defect Claim?
Georgia law establishes deadlines that can limit the time available to pursue construction defect claims. The applicable deadline depends on the type of claim, the parties involved, the relevant contracts, and the circumstances of the alleged defect. Associations should not assume that the deadline begins when the board first discovers a problem.
One important provision is O.C.G.A. § 9-3-51, Georgia’s statute of repose for certain claims involving deficiencies in the design, planning, supervision, or construction of improvements to real property. The statute generally bars covered actions brought more than eight years after substantial completion, subject to statutory provisions and exceptions. Certain injury claims arising during the seventh or eighth year may qualify for an additional period under the statute. The precise application depends on the facts and type of claim.
Different deadlines may apply to construction contracts, warranties, and other types of legal claims. A statute of repose is different from a statute of limitations, and more than one deadline may apply to the same claim. The deadline does not necessarily begin when the association discovers the defect or notices visible damage.
Construction Defect Timeline: Why Early Action Matters
The following timeline illustrates why associations should document issues and seek advice promptly. It is a general planning example, not a calculation of a specific claim deadline.
- At discovery: Document the defect, address urgent safety or water-intrusion concerns, and preserve available records.
- During the initial investigation: Obtain appropriate technical evaluations, review construction and maintenance records, and determine whether additional testing is needed.
- As potential causes become clearer: Review governing documents, contracts, warranties, insurance coverage, and possible claims with qualified counsel.
- Before major repairs, when practical: Coordinate documentation, inspections, and evidence preservation without delaying necessary emergency work.
- As soon as possible: Identify the potentially applicable limitation periods, statute of repose, contractual notice provisions, and other deadlines. Do not wait for a final repair estimate or complete investigation before seeking legal advice.
Because the legal deadlines can be complex, a Georgia construction attorney should evaluate the association’s specific circumstances rather than relying on a general timeline.
How Can a Construction Law Attorney Help a Georgia Condo Association?
A construction defect matter can involve both technical building issues and legal questions about contracts, responsibility, and the association’s authority. An attorney experienced in construction disputes can help the board evaluate potential claims, coordinate with technical consultants, review applicable deadlines, and consider available paths toward resolution.
Winter Capriola Zenner represents clients in construction law and disputes, including matters involving defective construction, and also advises community associations on legal issues affecting their operations. The firm’s construction and community association practices can help address the intersection of building defects, association responsibilities, and potential recovery.
Since its founding in 2010, Winter Capriola Zenner has represented clients in complex construction disputes involving condominium properties. The firm’s attorneys bring more than 30 years of construction law experience, including work on high-rise condominium construction defect cases. WCZ secured a $5 million recovery for a high-rise residential condominium tower involving construction and millions more for many other condominiums across the metro area. This experience informs the firm’s approach to evaluating liability, documenting damages, and pursuing recovery where warranted.
Protecting Your Condominium Association’s Interests
When a Georgia condominium association discovers a potential construction defect, the board should address immediate risks, document the condition, obtain qualified professional assessments, review its responsibilities, and evaluate legal options promptly. These steps can help the association understand the problem, make informed repair decisions, and preserve potential avenues for recovering eligible costs.
Because construction defect claims can involve complex technical issues and strict legal deadlines, early coordination among the board, qualified building professionals, and legal counsel can be an important part of protecting the community’s long-term interests.

Eric B. Coleman
Partner, Winter Capriola Zenner
Eric B. Coleman is a Partner at Winter Capriola Zenner, where he focuses his practice on commercial litigation, business torts, and dispute resolution throughout Georgia. He represents business owners, corporations, limited liability companies, partnerships, developers, and investors in complex disputes involving breach of fiduciary duty, business divorces, fraud, misappropriation of corporate assets, contract disputes, and other high-stakes commercial matters. Eric is committed to helping clients protect their businesses through strategic, practical legal counsel tailored to their unique objectives.